Doan Brook Enhancement Project–Latest news on this new project

February 14th, 2011 | Post Author: Bill Jones

Northern Ohio Regional Sewer District held a meeting in January to get shareholders input on their design objectives for enhancement of Doan Brook in the section from East 105th & MLK Jr.Blvd lagoon north to just short of the Superior Road bridge where the Cultural Gardens begin.

A knowledgeable representative of the Cleveland Cultural Gardens Federation (CCGF) attended the meeting.

Briefly, this new project will 1) Maintain current stream alignment; 2) Reconstruct a stable stream channel with the proper dimension, pattern, and profile that can handle local flows; 3) Improve the habitat through stable pools and riffles; creation of low-flow channel and thalweg (edit.definition: deepest parts of the brook and the fastest flowing); use terraced flood plains of re-used wall materials and use plantings that fit the park setting.

Additionally, their top Design Objective is: Minimize impact to the historic Cultural Gardens.

CCGF applauds NORSD for working with us to insure the best possible result for everyone affected.

Post to Twitter Post to Delicious Post to Facebook Post to MySpace


Leave a Reply